  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer  B. buildings are made from a set of standardized units

  C. similar buildings can be produced  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.  C. Pulleys. D. Hydraulic jacks.

  參考答案: A C B D A

  

  68

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer  B. buildings are made from a set of standardized units

  C. similar buildings can be produced  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.  C. Pulleys. D. Hydraulic jacks.

  參考答案: A C B D A

  

信息流廣告 周易 易經 代理招生 二手車 網絡營銷 旅游攻略 非物質文化遺產 查字典 社區團購 精雕圖 戲曲下載 抖音代運營 易學網 互聯網資訊 成語 成語故事 詩詞 工商注冊 注冊公司 抖音帶貨 云南旅游網 網絡游戲 代理記賬 短視頻運營 在線題庫 國學網 知識產權 抖音運營 雕龍客 雕塑 奇石 散文 自學教程 常用文書 河北生活網 好書推薦 游戲攻略 心理測試 石家莊人才網 考研真題 漢語知識 心理咨詢 手游安卓版下載 興趣愛好 網絡知識 十大品牌排行榜 商標交易 單機游戲下載 短視頻代運營 寶寶起名 范文網 電商設計 免費發布信息 服裝服飾 律師咨詢 搜救犬 Chat GPT中文版 經典范文 優質范文 工作總結 二手車估價 實用范文 古詩詞 衡水人才網 石家莊點痣 養花 名酒回收 石家莊代理記賬 女士發型 搜搜作文 石家莊人才網 鋼琴入門指法教程 詞典 圍棋 chatGPT 讀后感 玄機派 企業服務 法律咨詢 chatGPT國內版 chatGPT官網 勵志名言 河北代理記賬公司 文玩 語料庫 游戲推薦 男士發型 高考作文 PS修圖 兒童文學 買車咨詢 工作計劃 禮品廠 舟舟培訓 IT教程 手機游戲推薦排行榜 暖通,電地暖, 女性健康 苗木供應 ps素材庫 短視頻培訓 優秀個人博客 包裝網 創業賺錢 養生 民間借貸律師 綠色軟件 安卓手機游戲 手機軟件下載 手機游戲下載 單機游戲大全 免費軟件下載 石家莊論壇 網賺 手游下載 游戲盒子 職業培訓 資格考試 成語大全 英語培訓 藝術培訓 少兒培訓 苗木網 雕塑網 好玩的手機游戲推薦 漢語詞典 中國機械網 美文欣賞 紅樓夢 道德經 標準件 電地暖 網站轉讓 鮮花 書包網 英語培訓機構 電商運營
主站蜘蛛池模板: 大佬和我的365天2在线观看| 精品国产一区二区三区www| 最近更新中文字幕在线| 国产精品入口麻豆完整版| 亚洲日韩国产二区无码| √天堂中文官网在线| 精品福利视频网站| 少妇大叫太大太爽受不了| 内射干少妇亚洲69xxx| 久久国产精品免费一区二区三区 | 99久久久久久久| www.日日爱| 亚洲国产精品yw在线观看| 国产免费观看青青草原网站| 亚洲欧美国产日韩天堂在线视| av色综合网站| 波多野结衣办公室33分钟| 国产超爽人人爽人人做| 亚洲一级黄色大片| 国产小视频你懂的| 日本动漫黄观看免费网站| 四虎成人精品一区二区免费网站 | 大尺度视频网站久久久久久久久| 天天碰免费上传视频| 亚洲日本香蕉视频| 国产精品久久自在自线观看| 成人毛片18女人毛片免费96| 亚洲美女视频一区| 黑人粗长大战亚洲女2021国产精品成人免费视频 | 亚洲国产成人久久精品软件| 国产成人精品男人免费| 打开双腿让老乞丐玩| 熟妇人妻中文字幕| 欧美日韩第一页| 久久久久久久97| 亚洲桃色av无码| 国产99视频精品免视看7| 在线观看毛片网站| 日韩制服丝袜在线观看| 色香蕉在线观看| 99久久99久久免费精品小说|